Hitachi Plant Trex

Tuas Tembusu BMCC Plant

Bisphenol A Plant - MBS 1

Tuas South Incineration Plant - Contract 3

Tuas South Incineration Plant - Contract 3

Lonza Biologics Bioreactor Plant Project

Senoko Power Station

SMDS Project at Bintulu

SMDS Project at Bintulu

MRT Phase 2B - Contract 403 Jurong East Station & Ulu Pandan Depot

MRT Phase 2B - Contract 403 Jurong East Station & Ulu Pandan Depot

Power Station Phase 2
Port Klang, Malaysia

Taxiway Bridges and Vehicular Bridges at Changi Airport

Taxiway Bridges and Vehicular Bridges at Changi Airport

Palm Resort Golf Country Club

Palm Resort Golf Country Club
  Home | Civil & Plant Projects  
 

No. Description Contract Period Client
1 FUJI OIL – Demolition, Earthwork, Piling and Reinforced concrete to ground level Nov 2016 To Mar 2017 Fuji Oil Singapore Pte Ltd
2 Molten Sulfur Project - Piling and Foundation For 1125TA Sep 2015 To Nov 2015 Singapore Refining Company Pte Ltd
3 HCU-2 Y2014 Improvement Project – New LPS 4303-F Civil Works May 2014 To
Aug 2014

Singapore Refining Company Pte. Ltd
4 Tuas Tembusu BMCC Plant Project – Design and Construction of Civil/Building Works for Biomass Co-firing Co-generation Plant – Stage 2A at Tembusu Cresent, Jurong Island Mar 2012 To
Dec 2013

Marubeni Corporation
5 Civil & Arch. Works for Trex project at Pulau Ayer Merbau, Jurong Island Dec 2011 To Jun 2013 Hitachi Plant Technologies Ltd.
6 Senoko Power Station Repowering Project - Stage II - Civil & Building Works Dec 2009 To Mar 2012 Kajima Corporation
7 Tuas Tembusu BMCC Plant Project - Design and Construction of civil/Building Works for Biomass Co-firing Co-generation Plant - Stage 1 at Tembusu Cresent, Jurong Island- Mar 2010 To Feb 2012
Marubeni Corporation
8 Proposed Addition of Process Equipment & Supports [OX] to the existing PPE Process Plant at 20 Sakra Road Nov 2010 To Jul 2011 S'pore Takada Ind. P. Ltd. (Asahikasei Plastics S'pore P Ltd.)
9 Water Soluble Polymer Plant Project - Civil and Building Works at Jurong Island Apr 2010 To Oct 2010
Singapore Takada Industries Pte Ltd
10 REC Project – Stormwater Drainage Works (RC Drain Works) ,4D Switch Yard & 4L/4M Sub-structure Works (RC Works) , Miscellaneous Buildings Sub-structure and Super structure Works (RC Works) and External Works at Tuas South Ave 14 Sep 2009


Bovis Lend Lease Pharmaceutical Pte. Ltd
11 Vopak Tank Storage Terminal Project – Phase 2 at 59, Penjuru Road (RC Works) Jun 2009


OTEC Singapre Pte. Ltd.
12 REC Site Services –Temporary Civil Works for Construction Area Sep 2008


REC Site Services Pte Ltd
13 Glaxo Singapore Bulk Vaccine Facilities SN 02 Plant – Off site Works at Tuas Oct 2008 Glaxo Smithkline Singapore P Ltd.
14 Genentech ECP – 1 Plant Project – Sub-structure Works at Tuas Jan 2008 Bovis Lend Lease Pharmaceutical Pte. Ltd
15 Vopak Tank Storage Terminal Project – Phase 1 at 59, Penjuru Road (RC Works) Mar 2008


OTEC Singapre Pte. Ltd.
16 Lonza Biologics Bioreactor Plant Project at Tuas South Ave 9 (RC Structure & Building Works) Jul 2007 Bovis Lend Lease Pharmaceutical Pte. Ltd.
17 Power Seraya Desalination Plant at Jurong Island (RC & Steel Structure Works and Building Works) Jun 2007 CH2M Hill
18 Abbott Nutrition International – Singapore Capacity Extension Project at Tuas South Ave 7/10 (Pilecaps and Footing Works) Aug 2006 Bovis Lend Lease Pharmaceutical Pte. Ltd.
19 Lonza Biologics Bioreactor Plant Project at Tuas South Ave 9
(RC Structure & Building Works)
Jan 2007 Bovis Lend Lease Pharmaceutical Pte. Ltd.
20 Denka Advantech Pte Ltd IV Project At 11 A Tuas Avenue 20 Aug 2006 Overseas Technical Engineering and Construction Pte Ltd
21 RC & Steel Structure Works and Architectural Works At Ulu Pandan Newater (DBOO) Project Dec 2006 Keppel Seghers Engineering Pte Ltd
22 Procession Plant and Equipment Foundation Facilities at Shipyard Road (Piling and Civil Works) Nov 2005 Biofuel Industries Pte. Ltd
23 SIS'88 Silo Foundation Works at Juron Port Road (Piling and Foundation Works) Sep 2004 OTEC Pte Ltd
24 SDWPS Project - Advance Civil Works at Tuas South Ave 1 (Piling and Temporary Facilitiy Works) Apr 2004 Hydrochem (S) Pte Ltd
25 Replacement of Mechanical and Electrical Equipments at Ulu Pandan and Changi water Reclamation Plant (Civil Works) Jun 2004 UEWB Industrial Engineering Pte Ltd
26 Flow Equalization Basin at Kim Chuan Reclamation Plant (Earthworks, Shoring and Bored Piling Works) Jul 2003 Keppel Engineering Pte Ltd
27 New Erection of DIC Alkyphenol Plant at Sakra Road/Sakra Crescent in Jurong Island Nov 2003 DIC International Chemical (S) Pte Ltd
28 Flow Equalisation Basin at Kranji Water Reclamation Plant
(Civil Works Sub - Contract)
Aug 2003 Public Utilities Board
29 Bisphenol A Plant in Pulau Sakra - Phase 3 (Design & Build) Jun 2002 Mitsui Bisphenol Singapore Pte Ltd
30 Bisphenol A Plant in Pulau Sakra - Phase 2 (Design & Build) Jul 2001 Mitsui Bisphenol Singapore Pte Ltd
31 Bisphenol A Plant in Pulau Sakra - Phase 1 (Design & Build) Mar 1999 Mitsui Bisphenol Singapore Pte Ltd
32 Tuas South Incineration Plant Contract 3
Civil & Building Works Sub-Contract
Mar 2000 Mitsubishi Corporation
33 Tuas A Power Station - Stage 1
2x600mv Turbine Gerneration Foundation Blocks and Circulating Water Conduits
Civil Works Sub-Contract
Nov 1997 Hitachi Works, Hitachi Ltd
34 Senoko Power Station
Extention to Combine Cycle Power Plant Civil & Building Works Sub-Contract
Jun 1996 Siemens Advanced Engineering Pte Ltd
35 Power Station Stage 3 Development - 3x250mv Reheat Stream Boilers and Auxillary Equipment at Pulau Seraya Jun 1996 Jurong Engineering Ltd
36 Marine Terminal & Pesek Landing Jetties in Jurong Feb 1994 Mobile Oil Singapore Pte Ltd
37 New KK Hospital Development at Kampong Java Rd.-Basement Substructure Works (JDC-Evergreat Joint Venture) Oct 1993 Public Works Department
38 Propylene Tank Project for PCS at Pulau Ayer Merbau Oct 1993 Ishii Iron Works Co. Ltd
39 Sea-water Piping Modification at Pulau Ayer Merbau Oct 1993 JGC Corporation
40 CRU Project at Pulau Merlimau May 1993 JGC Corporation
41 SMDS Project at Bintulu ,West Malaysia a) Building Works(Design & Build) b) Civil Works Sep 1992 JGC (M) Sdn Bhd
42 Senoko Incineration Plant Project Contract IV Boiler House Sub-Contract Works Mar 1992 Mitsubishi Corporation
43 Palm Resort Golf Country Club , Johor, Malaysia
a) Earthworks, Drainage, Road & 18- hole golf course
b) Clubhouse and Recreation Centre
Feb 1992 Palm Resort Sdn Bhd
44 SRC Re-Instrumentation Project Building Works Pulau Merlimau Feb 1992 JGC Corporation
45 PUB Power Station Development Stage 2 Boiler House, Pulau Seraya Civil Works Dec 1991 Jurong Engineering Ltd
46 Ocean Tower at Shenton Way Substructure Works Mar 1990 Ocean Towers Pte Ltd
47 Interchange at Jalan Admad Ibrahim / Jalan Boon Lay / Jurong Pier Road
(JDC-Bored Piling Joint Venture)
Nov 1989 Public Works Department
48 Power Station Phase 2 Port Klang, Malaysia (JDC/Mudahaya/Panzana Joint Venture) Feb 1989 National Electricity Board
49 Vehicular Flyover at Thomson Road / Lornie Road / Upper Thomson Road / Braddel Road (Design and Build) (JDC-Tekkan-Bored Piling-Hexagon JV) Apr 1988 Public Works Department
50 MRT Phase 2B - Contract 403 Jurong East Station & Ulu Pandan Depot (JEL/JDC Joint Venture) Oct 1988 Mass Rapid Transit Corporation
51 MRT Link and External Walkway for The Standard Chartered Bank at Battery Road Dec 1987 The Standard Chartered Bank PLC Singapore
52 Interchange at Pan Island Expressway / Jurong Town Hall Road (Design and Build) (RDC/JDC Joint Venture) Nov 1986 Public Works Department
53 Earthworks, Drainage, Road, Culverts Miri, East Malaysia Sep 1986 Kumpulan Parabena Sdn Bhd
54 SRC HCU-2 Project at Pulau Merlimau Civil Works Feb 1986 JGC Corporation
55 Serangoon Sludge Treatment Works Extention, Contract 1 Main Civil Works Jan 1986 Hexacon Construction Pte Ltd
56 OUB Centre at Raffles Place Caison Foundation Substructure (Kajima-Hazama-JDC Joint Venture) Oct 1983 OUB Centre Pte Ltd
57 Treasury Building at Shenton Way Cassion Foundation Substructure Works Jun 1983 Singapore Treasury Building (Pte) Ltd
58 The Standard Chartered Bank Building at 6, Battery Road Excavation & Sub-Structure Works Nov 1982 The Standard Chartered Bank
59 Taxiway Bridges and Vehicular Bridges at Changi Airport Mar 1982 Public Works Department
60 Jurong & Pandan Bridges over Jurong and Pandan Rivers (Design and Build) Mar 1981 Jurong Town Corporation